Steward Healthcare RRMC Entry Renovation Healthcare

Steward Healthcare RRMC Entry Renovation

Rockledge, FL
PeakCM was brought in on Steward Healthcare's Rockledge Regional Medical Center entry renovation project to replace another GC who was over budget. PeakCM managed permitting, const...
Completed
2021
Steward Healthcare - Rockledge Electrophysiology Lab Renovation Phase I Healthcare

Steward Healthcare - Rockledge Electrophysiology Lab Renovation Phase I

Rockledge, FL
Renovation of an existing space to become a second electro-physiology suite for the hospital utilizing the latest Philips Azurion equipment. Construction occurred while the surroun...
Size
11,500 SF
Completed
2023
Steward Healthcare - Coral Gables North Maintenance Healthcare

Steward Healthcare - Coral Gables North Maintenance

Coral Gables, Florida
Campus wide improvements, maintenance, and modifications based on local and state building and health codes, including but not limited to: Roof Repairs, Exterior Envelope Repairs,...
Completed
2023
Steward Healthcare Medical Office Fitup Healthcare

Steward Healthcare Medical Office Fitup

Viera, Florida
The project included two separate tenant spaces within a portion of an existing shell building. The total fit up was 3,419 sf and included exam rooms, procedure rooms, nurses stati...
Size
3,419 SF
Completed
2020
4632 Office Renovation Commercial

4632 Office Renovation

Orlando, FL
Complete office building renovation transforming the space into modern professional offices, serving as PeakCM headquarters.
Completed
2020
Orange County Cultural Center Phase I Cultural

Orange County Cultural Center Phase I

Orlando, FL
Phase I construction of the Orange County Cultural Center, creating spaces for arts, education, and community engagement.
Completed
2019
Spaulding School Educational Alternatives Education

Spaulding School Educational Alternatives

Barre, VT
Educational facility construction and renovation for Spaulding School, creating specialized learning environments for alternative education programs.
Completed
2018
Fairfield Center School Art & Music Education

Fairfield Center School Art & Music

Fairfield, VT
Art and music wing addition for Fairfield Center School, expanding creative learning opportunities for students.
Completed
2017
NMC Pain Management Expansion Healthcare

NMC Pain Management Expansion

St. Albans, Vermont
The 11,615 expansion renovation project located in downtown St. Albans, Vermont was completed while the Northwestern Medical Center Clinic continued to see patients. Some work was...
Size
11,615 SF
Completed
2017
NMC Urine Toxicology Clinic Healthcare

NMC Urine Toxicology Clinic

St. Albans, Vermont
Renovation of the space while the surrounding floor and building is occupied, complying with all ICRA and AHCA regulations. PeakCM created an elaborate scaffolding system to allow...
Completed
2016
Union Bank Jericho Commercial

Union Bank Jericho

Jericho, VT
A 2,184 SF project to build a new out of the ground branch for Jericho Bank. The project scope includes a drive through, decorative copula, exposed interior timber framing, and lar...
Completed
2017
FastSigns South Burlington Commercial

FastSigns South Burlington

South Burlington, VT
The FastSigns franchise engaged PeakCM to construct their South Burlington, Vermont location. The storefront facility was fit-out to provide spaces for a reception area, administra...
Completed
2016